摘要:Ps workflow:comac avaliablity check (background job)MF60 stage ->TR creatLB10-> create TOZWM_TO_PICK -> confirm TO transfer within company in differen
阅读全文
Schedule Margin Key in Production Scheduling
摘要:refer to Scheduling Margin Key for Floats Key that the system uses to determine the floats required for scheduling an order. You define the following
阅读全文
SAP Quality Management - zhuan
摘要:Quality Management (QM) is an integral part of the supply chain and logistics functions and within the SAP system. It is fully integrated with complem
阅读全文
简要探讨物料的三种反冲模式“Backflush- 转
摘要:在PP模块的日常运作中,物料的反冲业务是很常见的现象。所谓物料反冲,指的是在生产订单的操作流程中,被设置为反冲的物料并不需要在单独的事务代码中被发送给生产订单,也就是说,反冲物料是不执行独立消耗的。而在生产订单被确认的同时,反冲料才真正被过账到生产订单中,即执行发料。也就是相应的会计凭证直到生产订单
阅读全文
MRP相关字段意思
摘要:1、未清期间:简单的说就是为计划员提供了一个提前处理的缓冲期。在逆推排产的逻辑下,比如MRP创建的计划订单开始日期是5日,未清期间是3天,那么假如当前日期是1日,就还没有进入未清期间,此时计划员就没必要这么早处理计划订单,而如果当前日期是3日,就在未清期间里了,此时在MD04中会有一个例外消息05产
阅读全文
MRP控制参数:计划文件与计划模式 -转
摘要:说说MPS/MRP控制参数中的计划模式(Planning mode)字段.首先看看计划模式到底是什么东东。 有3个参数: 1.适应计划数据(普通模式) 2.重展BOM和工艺路线 3.删除并重新创建计划数据 相信大家看到2,3都很好理解, 选择2, 运行MPS/MRP的时候就会按照需求日期重展相关单据
阅读全文
MRP控制参数:计划文件与处理代码
摘要:以下内容,转自网络http://blog.csdn.net/yuqinying112/article/details/7720766 NETCH(净变化计划):即只计划上次计划以后计划相关内容发生变动的物料(注意,某些物料的参数发生变动了,系统也认为计划内容没发生变动) NETPL(计划周期内的净变
阅读全文
MRP 过程示例-转
摘要:以下内容来自某位前辈 3.1 MRP运行的简要说明 本节以一个例子简要说明MRP的运行过程,并解释MRP、MPS的关系、流程以及相应的系统操作。 3.1.1 MRP运行示例 产成品X包含1个半成品Y、1个原材料A,半成品Y包括1个原材料B,该产成品运行MRP,其过程如下。 1. 产成品净需求计算(C
阅读全文
运行MRP需注意事项 -转
摘要:一、库存地点 每个工厂下都存在多个库存地点,默认MRP运行是基于整个工厂运行,即所有库存地点都参与MRP计算,因此需要考虑特别情况下,是否应在库存地点级别设置该库存地点参与MRP计算,譬如对于客户暂时寄存在公司的货物所属的库存地点设置不参与MRP运算。 通过事务代码OMIR设置库位的MRP标识(MR
阅读全文
What is rescheduling and how does it work -zhuan
摘要:Purpose The objective of this WIKI is to provide an overview of the MRP rescheduling check and examples of the most common issues and questions in thi
阅读全文
MRP 与MPS之间的差别
摘要:MRP 与MPS之间的差别; Explain the diffenence between MRP & MPS,Though both components gives you the requirement list, what we gain out of MPS run rather than
阅读全文
Materials are not planned by MRP
摘要:SymptomSome materials are not planned by MRP even if the processing key NEUPL is applied in the total planning transaction code MD01 or program RMMRP0
阅读全文
planning file entry -analysis
摘要:Cause and prerequisites No planning file entry is created if the planned order is moved into the opening period. The material is excluded from the nex
阅读全文
SA not e 53235
摘要:SAP note 53235 Summary Symptom Materials planning is executed with purchase requisition creation indicator '2', that is, within the opening period pur
阅读全文
MRP planning file entry
摘要:1890440 SymptomSome materials are not planned by MRP even if the processing key NEUPL is applied in the total planning transaction code MD01 or progra
阅读全文
MRP configue
摘要:There are Other setting in config which clearly suggest that system will create PR after MRP Run. OPPZ
阅读全文