Optimized Purchasing
Definition
Optimized Purchasing包括4个部分,见下图
Optimized Purchasing4个部分相对应的T-Code如下
The Process Flow
1. Ordering: Assigned Purchase Requisitions
这一步就是指派供应商+Release PO
1.1 About PR
PR的三要素:物料、数量、采购日期(日期是会影响价钱的)
创建PR -- ME51/ME51N (10014044)
这里就特别说下Fixed ID如果勾上,系统MRP就不会动到这张PR,必须手动变更。
1.2 Assigned PR的 T-Code:ME56 --- 只指派Vendor不生成PO
选中需要Assign的PR点击Assign Automatically
2. Automatic Generation of POs --- ME59N
2.1 Vendor master 选允许自动 -- XK01/MK01
2.2. Mat. master选允许自动PO -- MM01/MM02
2.3 Run Automatic Generation -- ME59N
3. Assigning and Processing Requisitions --- ME57
就是说Assign Source和转PO在一个T-Code处理
3.1. List requisitions
3.2. Assign Source
3.3. list of assigned PR
3.4 Process Assignment
4. Purchase Order with Source Determination -- ME25
事先没有PR、outl. aggreement、PO,输入完资料再决定转成那种单据(PO or PR)
4.1 Enter Item data
4.2 Assign source
4.3 Generate PO or PR
4.3.1 Generate PO
4.3.2 Generate PR
Note