Revision Level在PS中的决定

何为Revision Level: 

You can identify material or document changes that are made with reference to a change number by the use of revision levels. 
When you want to process the BOMs for these materials or documents at a later date, you can find and call them using either the change number or the revision level.

http://help.sap.com/saphelp_erp60_sp/helpdata/en/d8/7329d14b7511d1894b0000e8323c4f/frameset.htm

先看配置.CJ12中,物料100-100的Revision Level是这么配置的.

image

当物料在项目中分配时, FM REVISION_LEVEL_SELECT会被读到. 可以看出, 输入后, Revision Level是由CAUFV-AUFLD决定的, 即Date of BOM Explosion/Routing Transfer. 这里是Network创建日期.故输出的RESBD-REVLV = B

Include LCOMDFM1

Form   MATERIAL_CHK

FM       REVISION_LEVEL_SELECT

image

RESB表 最后一项09

image

SAP提供BADI REV_SELECT, Method SELECT_INDIVIDUAL进行用户自定义

image

image

posted on 2011-02-22 17:12  懒芒果  阅读(1646)  评论(1编辑  收藏  举报