漫谈SRM主数据迁移及同步(4. 工厂主数据篇)

STEPS:
1.Adjust region codes via customizing (Utilities>Adjustment)

 

 

2.Replication takes place via one of three reports:

BBP_LOCATIONS_GET_ALL:   replicates all plants where a single ERP system is in the landscape

BBP_LOCATIONS_GET_FROM_SYSTEM:  replicates all plants from a specific ERP system

BBP_LOCATIONS_GET_SELECTED:   replicates a single plant form a specific backend

 

3.Monitor the replication via txn SLG1 in SRM
TIPS:

Frequently invalid region codes cause errors.  The missing regions need to be created in SRM. If recommended step 1 is carried out this avoided.

Any other data issues usually need to be resolved in the ERP system. Usually caused by missing data.


SAP Notes

563180 -Locations - Replication of R/3 plants

1353259 - Tax Jurisdiction Code not transferred fromplant to locations

1232990- BBP_PD_MSG_ADD creates dump: Log overflows

 

 

最后上个图

posted on 2010-11-03 23:23  懒芒果  阅读(853)  评论(0编辑  收藏  举报