01 2015 档案
摘要:The major integration is in MRP............ During MRP how the system should create procurement proposals..MM & PP is integrated in follwoing ways :1....
阅读全文
摘要:1. Addition to existing stock is NOT allowed to implement FIFO concept . Because FIFO is carried out based on the goods receipt date , if there is an ...
阅读全文
摘要:Milestone Confirmation is for Discrete Manufacturing.Reporting point backflush is for REM. ~~~~~~~ But the settings in Control key are the same for bo...
阅读全文
摘要:重订货点法(Reorder Point)是物料需求计算的一种重要方式,与通常意义上的MRP方 式不同,重订货点法属于基于消耗计算物料供给的方法。其基本的指导思想是,补货元素的生成与物料需求不直接相关,而是以当前库存作为最重要的参照指标。通 过周期性的库存检查,每当库存水平低于预设的采购触发线(即重订...
阅读全文
摘要:MRP3-- > Availability check ---> Total replenishment lead time (in workdays) For in-house produced material and it is taken into consideration in the...
阅读全文
摘要:UseYou can use the Product Cost Planning functions to calculate the cost of goods manufactured (COGM) and cost of goods sold (COGS) for products such ...
阅读全文
摘要:凡是work order 里面含有VCAL 状态的(即做完差异计算之后), 在costing 里面都会看到target cost , 对于标准件 MTS ; 但是只有RESA OR 没有RESA 并且没有VCAL 的MTS 的 work order , 里面的target costs 是空的 。 1...
阅读全文
摘要:Link : http://scn.sap.com/docs/DOC-57020This document will explain how to automate the execution of steps in SAP using the Script Recording and Playba...
阅读全文
摘要:Question :I have a plant in which for many materials, I have assigned MRP Controller.Now I want to know that for only this MRP controller, can I set M...
阅读全文
摘要:Purpose : Performance Efficiency Rate KeyPerformance efficiency rate keys are assigned in the Basic data screen of the work center to the standard val...
阅读全文