MRP4 -- Dependent requirements ind. for individual and coll. reqmts
Dependent requirements ind. for individual and coll. reqmts
Indicator determining whether the following requirements are allowed for the dependent requirements of the material:
- Individual requirements
- Requirement quantities of the dependent material are stated individually.
- Collective requirements
- Requirement quantities of the dependent material are grouped together.
Use
You can maintain this indicator in the following places:
- In the material master record
- For the explosion type of the BOM item (in Customizing for Basic Data in Define Explosion Types)
The setting for the explosion type overrides that in the material master record.
Dependencies
If the material is assigned to a material type that does not allow quantity-based inventory management(KMAT type) in this plant, you can set the indicator to individual requirements only.
If the stock is to be managed in sales order stock or project stock, the indicator must be set to one of the following options:
- Individual and collective requirements
- Individual requirements only
If a material managed in project stock is to be procured from another plant using a cross-company-code stock transport order, the indicator must be set to 2 (collective requirements) in the issuing plant because, in this specific context, individual project stock management is not possible in both plants.
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
If you set Individual indicator for both header material and dependent material, then if sale order comes for 1000 qty, then During MRP run system will create a plan order with reference to sale order and for dependent material, system will plan dependent material as sale order relevant. System won't consider warehouse stock for that sale order.
In your Case, you can set Individual/collective indicator as 1 for dependent components not for Header material. Mostly this can be used for make to order scenario.
If you set the Individual/collective indicator as 1 for the Header material, during MRP run system will not consider the existing warehouse stocks for the Sales order, MRP will create Planned order against of Sales order.
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
indicator = "1 " --- Mostly for KMAT material (KMAT type) and make-to-order scenario .
indicator = "2" ----
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
What is the relevance of individual/Collective Requirement indicator from MRP4 view of material for Finished product as well as its sub assemblies in case of make to Stock planning strategies.
Answer:
Individual & collective indicator plays a major role in MRP.
If you set Individual indicator for both header material and dependent
material, then if sale order comes for 100 qty, then During MRP run system
will create a planned order with reference to sale order and for dependent
material, system will plan dependent material as sales order relevant. System
won't consider warehouse stock for that sale order.
If you set collective indicator for dependent material system will
consider warehouse stock for dependent material.
MRP-4 as 1 : In individual planning, this indicator is used
to display the dependent requirements of a component separately.
MRP-4 as 2 : In collective requirements, this indicator is used
to display the dependent requirements of a component grouped together.
This Indicator is useful to control the planning of dependent requirements
if the main product is being planned with strategy 20 i.e.; MTO Process.
MARC-SBDKZ indicator controls whether individual or collective
customer requirements planning is allowed for dependent requirements means
low level in BOM.
If you define individual requirements for explosion, dependent requirements
for a component are shown individually on the superior low-level code.
If you define collective requirements for explosion, required quantities
for the material are summarized independently of the sales order.
In the MTO scenario, if you want to check the unrestricted raw material
stock when you run the MRP for sales order. Please check by selecting
individual/collective requirement as 2.
Please note:
- If you select individual requirement then system will not consider
available stock and generate Proposals for every single requirements.
Also you will find PR and Plan order with account assignment of Sales order
(in case of MD50).
- If you select collective requirement then system will not generate
planning proposals through MD50. In that case you have to
go for individual MRP (MD02 / MD03 / MD41 / MD42).
For FG stock you can assign to sales order through MB1B by 412
E movement type.
【推荐】国内首个AI IDE,深度理解中文开发场景,立即下载体验Trae
【推荐】编程新体验,更懂你的AI,立即体验豆包MarsCode编程助手
【推荐】抖音旗下AI助手豆包,你的智能百科全书,全免费不限次数
【推荐】轻量又高性能的 SSH 工具 IShell:AI 加持,快人一步
· Linux系列:如何用heaptrack跟踪.NET程序的非托管内存泄露
· 开发者必知的日志记录最佳实践
· SQL Server 2025 AI相关能力初探
· Linux系列:如何用 C#调用 C方法造成内存泄露
· AI与.NET技术实操系列(二):开始使用ML.NET
· 被坑几百块钱后,我竟然真的恢复了删除的微信聊天记录!
· 【自荐】一款简洁、开源的在线白板工具 Drawnix
· 没有Manus邀请码?试试免邀请码的MGX或者开源的OpenManus吧
· 园子的第一款AI主题卫衣上架——"HELLO! HOW CAN I ASSIST YOU TODAY
· 无需6万激活码!GitHub神秘组织3小时极速复刻Manus,手把手教你使用OpenManus搭建本