SAP MRP4 view -- individual / collective requirements的理解
1. Material Master --- > MRP4 -----> BOM explosion/dependent requirements ---- > individual / collective requirements
Individual collective indicator is only for MTO strategies.
Where in the procurement happens account assigned to Sales Order.
If you want to individually procure or collectively procure the components is based on the selection on 1 or 2.
For MTS Materials all the dependent requirements will be procured collectively.
In your case Planning stragey for A and B is 40, so the dependent material Z will be procured collectively only.
Make to Stock -Planning here dependent requirement of the header material will be group together as per the requirement same date .It will not follow up the Individual or Collective requirement Indicator which is only applicable for MTO materials.
What is the planning strategy you are using?
I hope you are doing MTO for Fert Material.
If u want raw material to be produced for with collective,
set the collective/ind = 2 for raw material alone at MRP4 view.
Run the MRP again with planning mode - 3 for FERT.
Also note If u want to system produce one procurement proposal for all two dep requiremnenst, set lot size as MB for components and try. is it what u required.collective requirement means component will produced for several requirements seperately, not for collective of all depent requirements if u set EX lot size.
【推荐】国内首个AI IDE,深度理解中文开发场景,立即下载体验Trae
【推荐】编程新体验,更懂你的AI,立即体验豆包MarsCode编程助手
【推荐】抖音旗下AI助手豆包,你的智能百科全书,全免费不限次数
【推荐】轻量又高性能的 SSH 工具 IShell:AI 加持,快人一步
· Linux系列:如何用heaptrack跟踪.NET程序的非托管内存泄露
· 开发者必知的日志记录最佳实践
· SQL Server 2025 AI相关能力初探
· Linux系列:如何用 C#调用 C方法造成内存泄露
· AI与.NET技术实操系列(二):开始使用ML.NET
· 被坑几百块钱后,我竟然真的恢复了删除的微信聊天记录!
· 【自荐】一款简洁、开源的在线白板工具 Drawnix
· 没有Manus邀请码?试试免邀请码的MGX或者开源的OpenManus吧
· 园子的第一款AI主题卫衣上架——"HELLO! HOW CAN I ASSIST YOU TODAY
· 无需6万激活码!GitHub神秘组织3小时极速复刻Manus,手把手教你使用OpenManus搭建本