Can we Allow goods issue after TECO of production order

Dear all,

 

i have one production order which is technicaly completed. But i want to do material issue as material reservation is pending for that order.Please give focus on issue and explain in detail on TECO and status of production order.  (TECO : technically complete)

 

Answer:

Normally , After you TECO production order , all the reservation will be deleted against that order and cannot use MB1A(MvT:261) to issue material to order 。

 

For Order status  CLOSED only - Goods movement is not possible,

 焦点:production order 被TECO后,是否可以未发的料,继续发料 ??

In TECO- Goods movemnt is possible unless some one has changed the setting in BS22.

posted @   jefflu99  阅读(445)  评论(0编辑  收藏  举报
编辑推荐:
· Linux系列:如何用heaptrack跟踪.NET程序的非托管内存泄露
· 开发者必知的日志记录最佳实践
· SQL Server 2025 AI相关能力初探
· Linux系列:如何用 C#调用 C方法造成内存泄露
· AI与.NET技术实操系列(二):开始使用ML.NET
阅读排行:
· 被坑几百块钱后,我竟然真的恢复了删除的微信聊天记录!
· 【自荐】一款简洁、开源的在线白板工具 Drawnix
· 没有Manus邀请码?试试免邀请码的MGX或者开源的OpenManus吧
· 园子的第一款AI主题卫衣上架——"HELLO! HOW CAN I ASSIST YOU TODAY
· 无需6万激活码!GitHub神秘组织3小时极速复刻Manus,手把手教你使用OpenManus搭建本
历史上的今天:
2012-08-29 解决32位工具如何连接64位DB---Oracle Instant Client 使用 说明
2012-08-29 使用Windows 命令行压缩程序 Winrar,在SQL存储过程中压缩Excel文件
点击右上角即可分享
微信分享提示