Production Order Type Selection
This section provides an overview of automatic selection of Order type for Production order in Discrete Manufacturing and the key configuration required for the same. |
Content
1. Order & Order Type
2. Configuration Settings required
3. Master Data required
4. Order Type Selection Process Flow
Order & Order Type
Order: Object that defines
-When, where and in which quantities which products are required or available
-Which work steps are necessary for these products and which resources are occupied by them
Order Type:
Key that differentiates orders according to their purpose. The order type contains a range of parameters which affect the way the order is processed. For example, using the order type, we can specify
-The number ranges to be used for the orders
-Which criteria are used when selecting a routing
-How the order is to be costed.
Configuration required
Order type can be defined in Plant Parameters, MRP Group Parameters and Production Scheduling Profile. Based on the field input in the material master, order type will be selected automatically. Different Order Types are maintained to depict the automatic order type selection process for the below.
- Define Order Type
Transaction Code: OPJH
Navigation: SPRO> Production> Shop Floor Control> Master Data> Order> Define Order Types
- Maintain Production Scheduler & Production Scheduling Profile
Transaction Code: OPJ9
Navigation: SPRO> Production> Shop Floor Control> Master Data> Define production scheduler
- Define Production Scheduling Profile
Transaction Code: OPKP
Navigation: SPRO> Production> Shop Floor Control> Master Data> Define production scheduling profile
- Maintain MRP Group Parameters
Transaction Code: OPPR
Navigation: SPRO> Production> Material Requirements Planning> Plant Parameters> MRP Groups> Carry Out Overall Maintenance of MRP Groups
- Maintain Plant Parameters
Transaction Code: OPPQ
Navigation: SPRO> Production> Material Requirements Planning> Plant Parameters> Carry
Out Overall Maintenance of Plant Parameters
Master Data
-
MRP Group assignment in MRP 1 view of the Material Master
-
Production Scheduler and Production Scheduling Profile assignment in Work Scheduling view of the Material Master
Order Type Selection Process Flow
Whenever Production order is created, either manually or with conversion of Planned Order, the order type is selected in the following Priority:
【推荐】国内首个AI IDE,深度理解中文开发场景,立即下载体验Trae
【推荐】编程新体验,更懂你的AI,立即体验豆包MarsCode编程助手
【推荐】抖音旗下AI助手豆包,你的智能百科全书,全免费不限次数
【推荐】轻量又高性能的 SSH 工具 IShell:AI 加持,快人一步
· Linux系列:如何用heaptrack跟踪.NET程序的非托管内存泄露
· 开发者必知的日志记录最佳实践
· SQL Server 2025 AI相关能力初探
· Linux系列:如何用 C#调用 C方法造成内存泄露
· AI与.NET技术实操系列(二):开始使用ML.NET
· 被坑几百块钱后,我竟然真的恢复了删除的微信聊天记录!
· 【自荐】一款简洁、开源的在线白板工具 Drawnix
· 没有Manus邀请码?试试免邀请码的MGX或者开源的OpenManus吧
· 园子的第一款AI主题卫衣上架——"HELLO! HOW CAN I ASSIST YOU TODAY
· 无需6万激活码!GitHub神秘组织3小时极速复刻Manus,手把手教你使用OpenManus搭建本