Validity period change for Cost Center Successfully

Use Tcode OKEON (standard hierarchy for cost center ) , in the basic data ---> analysis time frame

How does one Deactivate a Cost Center

How does one Deactivate a Cost Center?

I can find a tcode to Activate an Inactive one but how do I deactivate a CC.  Or is it so simple I cannot see it...

Marios

Go to KS02- Change Cost Center. Go to the Control Tab. Tick on the checkbox for desired transaction activity you want to lock. Any postings made against the cost center under locked activity/ies will not be allowed.

Tiongco, Jezel D.

Thank you, I knew I could block the postings but I want to somehow make the Cost Center Look Inactive. 

To explain:
In transaction OKEON (Change Standard Hierarchy) I have Green Dots for Active CC's.  The legend (attached) says a Red Dot is for Inactive CC's.

How do you do that?

Marios

Hi Marios, If you want to change the status to inactive, the only optioin as far as my knowledge is concerned is to change the validity period. when you double click the cost centre, details of cost centre will be displayed at the bottom by T code OKEON and you will find the status of cost centre there, just right of that you will find button to change the validity period, change the period to some future date then it turns to inactive status.

Kittu

Excellent!  It works.

Thank you very much.

I had changed the Validity Period before but I set it to start right where the previous time horizon ended so looking in the future this was always active.

posted @   jefflu99  阅读(654)  评论(0编辑  收藏  举报
编辑推荐:
· Linux系列:如何用heaptrack跟踪.NET程序的非托管内存泄露
· 开发者必知的日志记录最佳实践
· SQL Server 2025 AI相关能力初探
· Linux系列:如何用 C#调用 C方法造成内存泄露
· AI与.NET技术实操系列(二):开始使用ML.NET
阅读排行:
· 被坑几百块钱后,我竟然真的恢复了删除的微信聊天记录!
· 【自荐】一款简洁、开源的在线白板工具 Drawnix
· 没有Manus邀请码?试试免邀请码的MGX或者开源的OpenManus吧
· 园子的第一款AI主题卫衣上架——"HELLO! HOW CAN I ASSIST YOU TODAY
· 无需6万激活码!GitHub神秘组织3小时极速复刻Manus,手把手教你使用OpenManus搭建本
点击右上角即可分享
微信分享提示