Activity Types(work center ; cost center)

Activity Types

Activity types are used to describe the various forms of activity that are performed at a cost center.

Activity types are valuated for each cost center and period with a charge rate that consists of a fixed portion and a variable (work-related) portion. Thus the costs incurred at a cost center can be distributed to products, according to which activities have been performed.

You can assign each standard value in the work center an activity type as a default

Relationships between the Cost Center, Activity Types, Work Center and Routing

The following graphic illustrates the relationships between cost center, activity types, work center and routing for costing internal activities.

 

This graphic is explained in the accompanying text

Relationships between the Cost Center, Activity Types, Work Center and Routing

The "Production" cost center has been assigned four activity types. Each activity type was valuated with a charge rate that is made up of a fixed and a variable (work-related) part. In this example, a setup hour (SET) costs $70.

Since the work center is assigned to a cost center, the activity types (as long as permissible in the cost center) can be assigned to standard values in the work center. In this example the activity types SET, MAC and LAB are assigned to the standard values "Setup", "Machine" and "Labor" in the "Milling machine 5" work center. These activity types are then suggested when the work center is assigned to a routing

In the work center a formula can also be assigned to each standard value for costing. Formulas are used to calculate activities for the operation quantity from the general operation data and the standard values.

The activity types are used to calculate the costs for these activities.

case案例分析解决(work center and activ):

Hi,
in trx CR02 when I click on F4 button to select an activity type in costing view, system prompts:

"No activity types assigned to cost center 7000, controlling area EL80 on 06.04.2011"

 

solution;

Hi!
I've done finished this issue!

Please follow steps below:
1. Create activity type in T-Code: KL01
2. Go to KP26 to create the realtionship between Cost Center and Activity.

Now you can see new activity in Costing tab.

 

 

posted @   jefflu99  阅读(971)  评论(0编辑  收藏  举报
编辑推荐:
· Linux系列:如何用heaptrack跟踪.NET程序的非托管内存泄露
· 开发者必知的日志记录最佳实践
· SQL Server 2025 AI相关能力初探
· Linux系列:如何用 C#调用 C方法造成内存泄露
· AI与.NET技术实操系列(二):开始使用ML.NET
阅读排行:
· 被坑几百块钱后,我竟然真的恢复了删除的微信聊天记录!
· 【自荐】一款简洁、开源的在线白板工具 Drawnix
· 没有Manus邀请码?试试免邀请码的MGX或者开源的OpenManus吧
· 园子的第一款AI主题卫衣上架——"HELLO! HOW CAN I ASSIST YOU TODAY
· 无需6万激活码!GitHub神秘组织3小时极速复刻Manus,手把手教你使用OpenManus搭建本
点击右上角即可分享
微信分享提示