随笔分类 -  SAP Manufacturing & Production Planning(PP)

SAP PP and APO topic hereby
摘要:MD04 阅读全文
posted @ 2021-09-24 10:01 jefflu99 阅读(1360) 评论(0) 推荐(0) 编辑
摘要:>>>>>> Collective Orders with Automatic Goods Movements (SAP recommends the use of collective orders with automatic goods movements. ) You can use col 阅读全文
posted @ 2021-09-15 23:40 jefflu99 阅读(214) 评论(0) 推荐(0) 编辑
摘要:MMRV / COGI 阅读全文
posted @ 2021-08-31 13:22 jefflu99 阅读(83) 评论(0) 推荐(0) 编辑
摘要:*** Now most of companies save efforts and improve efficiency of shopfloor operation by automating production processes using SAP Backflush and Automa 阅读全文
posted @ 2021-08-31 10:23 jefflu99 阅读(95) 评论(0) 推荐(0) 编辑
摘要:关于Settlement rule后台配置Create cost element (internal settlement)问题1:有同事手工创建了一个PO,但是没有determine settlement rule,月末结帐没有办法calculate variance。想再手工添加,可是结构和自动... 阅读全文
posted @ 2015-02-10 14:12 jefflu99 阅读(2330) 评论(0) 推荐(0) 编辑
摘要:Question :I have a plant in which for many materials, I have assigned MRP Controller.Now I want to know that for only this MRP controller, can I set M... 阅读全文
posted @ 2015-01-07 13:26 jefflu99 阅读(659) 评论(0) 推荐(0) 编辑
摘要:Purpose : Performance Efficiency Rate KeyPerformance efficiency rate keys are assigned in the Basic data screen of the work center to the standard val... 阅读全文
posted @ 2015-01-04 18:08 jefflu99 阅读(682) 评论(0) 推荐(0) 编辑
摘要:Which is the table of the order production operation details? I need to get the activities for production order : Setup, Labor, Machine, Confirmed and to confirm.I can see look at this in CO02 / Operation Overview (f5) / OperationDetalis / Qty-ActivitiesThat is probably the hardest information to pi 阅读全文
posted @ 2013-11-16 00:44 jefflu99 阅读(4716) 评论(0) 推荐(0) 编辑
摘要:生产订单状态详解 Production order status状态 名称 系统简称 状态触发与设定CRTD 建立 生产订单创建时的状态,表明订单处于刚刚创建时点,不允许做后续发料,确认等操作。PREL 部分释放 当对生产订单做部分下达时的状态,如仅下达部分工序时。REL 已释放 当生产任务确定可下发至车间生产时,将生产订单下达,开始后续业务流程。MANC 未检查物料可用性 生产订单未做组件物料的可用性检查分析。PRC 预花费 生产订单计算计划成本。Plannedcosting calculationSETC 结算规则维护 表明生产订单是否维护结算规则。NTUP 日期未更新 表明生产订单日期人 阅读全文
posted @ 2013-10-31 15:01 jefflu99 阅读(1992) 评论(0) 推荐(0) 编辑
摘要:Production Order Phases Production orders go through different phases that follow on from one another. These phases are represented by the production order status:1. First, production orders are created (CRTD).2. Production orders are released (REL).3. Shop floor papers are printed (PRT).4. Producti 阅读全文
posted @ 2013-09-23 09:23 jefflu99 阅读(746) 评论(0) 推荐(1) 编辑
摘要:PP reportsBOMCS11 - BOM Level by LevelCS12 - Multilevel BOMCS15 - MaterialCS14 - BOM ComparisonCS80 - Material BOMWork CentersCR60 - Work Center Information SystemCA80 - Use of Work Center in Task ListsCR05 - Work Center ListCR07 - Work Center CapacitiesCR06 - Work Center Assignment to Cost CenterCR 阅读全文
posted @ 2013-09-18 11:01 jefflu99 阅读(504) 评论(0) 推荐(0) 编辑
摘要:The main function of material requirements planning is to guarantee material availability, that is, it is used to procure or produce the requirement quantities on time both for internal purposes and for sales and distribution. This process involves the monitoring of stocks and, in particular, the au 阅读全文
posted @ 2013-09-18 10:37 jefflu99 阅读(579) 评论(0) 推荐(0) 编辑
摘要:requirement :Hi Experts,Can anybody please help me to create status profile.1. Production order should not allowed TECO untill confirm the order.2. Production order should not allowed GR untill GI. Please tell step by step procedure.>>>>>>>>>>>>>>>>> 阅读全文
posted @ 2013-09-15 00:49 jefflu99 阅读(772) 评论(0) 推荐(0) 编辑
摘要:首先我们都已经很熟悉PP里面的backflushing 的动作, backflushing的实质就是系统自动进行扣料 withdrawal(发料 Goods issue) , 而下阶的采购件的预留也会被冲销了。最后一步的confirmation, 就是我们看到产成品的收货(MvT -101)Backflushing is automatic accounting (Goods issues - 261 mvt) of material consumed for production, at the time of confirmation. Eg. When a 4 wheeler autom 阅读全文
posted @ 2013-09-07 23:24 jefflu99 阅读(5817) 评论(0) 推荐(0) 编辑
摘要:今天在保存一个production order的时候,报出了如下的错误;No valuation variant found for valuation area T666Message no. C6015DiagnosisThe system could not find a valid valuation variant for valuation area T666.If the valutaion variant is not assigned to a valuation area, this will have the following effect on the valuati 阅读全文
posted @ 2013-07-19 22:06 jefflu99 阅读(1881) 评论(0) 推荐(1) 编辑
摘要:Bill of Material (BOM) is a base functionality of setting up production module of an ERP system. A manufactured item consists of components, which are used to build the product through production operation(s). The main use of BOM is to define product structure of a manufactured end item.Routing is a 阅读全文
posted @ 2013-07-17 22:12 jefflu99 阅读(867) 评论(0) 推荐(0) 编辑
摘要:Calculation of Lot Sizes for the Procurement ProposalsAfter analysing the shortage quantities (in the last step), SAP MRP run starts the process of creation ofthe requirement proposal/procurement proposalfor the shortage quantity (where the available quantity is short).When creating the procurement 阅读全文
posted @ 2013-07-14 16:14 jefflu99 阅读(1402) 评论(0) 推荐(0) 编辑
摘要:计划策略70是一个好策略。但是也需要 Mixed MRP 的配合。策略组70的能办的事:的核心目标为:为产成品的下一阶物料做中长期计划(PIR),对应的业务场景为,核心物料为半成品,而产成品则是在核心物料基础上增减、修改配置。 可以这样理解,半成品占据了整个物料成本的(绝)大部分,并且也占了整个生产周期的大部分,由于成品订单的多样性(或不确定性),因此,最恰当的方式是为 半成品而不是成品做中长期备货计划。 Mixed MRP 能办的事:Mixed MRP 为空的情况下,即缺省的情况下,只在销售订单(SO)能够冲减PIR,其它的MRP元素比如U1:库存转储订单, DepReq:相关需求等并不能消 阅读全文
posted @ 2013-07-12 23:54 jefflu99 阅读(2358) 评论(0) 推荐(0) 编辑
摘要:Production Order System StatusTell the difference between TECHO and CLOSED.TECO means Technically completed order, means with out full completion of order. That production order stopped because of some reasons. CLOSED means after completion of confirmation and settlement the order is fully closed fo 阅读全文
posted @ 2013-07-11 23:30 jefflu99 阅读(693) 评论(0) 推荐(0) 编辑
摘要:Production Order StatusThe prerequisite to DLFL an order is that the cost balance is zero. This can be achieved either by not posting any activity to the order, or by settling the cost. Settlement can only occur oncethe order has been received into stock (DLV), so if there is aproblem TECO is used t 阅读全文
posted @ 2013-07-11 22:32 jefflu99 阅读(777) 评论(0) 推荐(0) 编辑