1 ECN

    Ecn  should be issued when modifying drawing,Copy children BOM of subassembly from BIL if one ECN/ECO introduce new subassembly per NPIEngineer /Planner's requirement,Create Cost table for scrapped part and rework parts after ECN implementation, lead old revision partsrework or scrap issue.New product and ECN evaluation and relevant solution implement.Ensure that the cost changes due to ECN's are updated in the cost sheets at the appropriate time。

 

2product specification

  As show in the photography.

System Configuration / Functional Block Descriptions  系统配置 、功能说明

Wiring Diagram         连接图

Schematic Drawing      原理图

BoM               元器件清单

Gerber File      你懂的

Critical Signal Flow Description and Margin Test Plan

Functions Description 

Reliability Test Requirements

Safety and Compliance Requirements

PCB DFM Issues

3 cypress nstall “PSoreatorSetup_4.0_es100_b432”

SysConfiguration / Functional Block Descriptions

Wiring Diagram

Schematic Drawing

BoM

Gerber File

Critical Signal Flow Description and Margin Test Plan

Functions Description

Reliability Test Requirements

Safety and Compliance Requirements

PCB DFM Issues