Live2d Test Env
摘要: There are N schedules, the i-th schedule has start time s i si and end time e i ei (1 <= i <= N). There are some machines. Each two overlapping schedu 阅读全文
posted @ 2018-10-18 15:37 nimphy 阅读(338) 评论(0) 推荐(0) 编辑
摘要: There is a nonnegative integer sequence a 1...n a1...n of length n n . HazelFan wants to do a type of transformation called prefix-XOR, which means a  阅读全文
posted @ 2018-10-18 14:37 nimphy 阅读(125) 评论(0) 推荐(0) 编辑