刘文龙( male, 29 )Self Assessment / Objective
>>Self Assessment:
Energetic and ready for new technology and others new things!
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
>>Contact Means
Mobile :13913320757(Mobile)
E-mail :
Blogs :http://hpunix.cnblogs.com/
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
>>Career Objectives:
It, telecommunication related jobs, the development of embed systems, Unix
relative development, or some kind of development related with computer system;
as well as the FAE of CMOS chip...
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
>>Summary/Target Job
Current Industry: Telecommunication (Equipment. operation)
Current Job Category: Telecommunication Engineer
Working Experience: 5 year(s)
Career Level: Senior Position (Non-managerial)
Desired Salary: Negotiable
Target Industry:
Electronics. Micro-electronics
Telecommunication (Equipment. Operation*Value-Added Service)
Computer Software
Computer Hardware. Network Equipment
Target Job Category:
Senior Software Engineer
FAE/SALE;
Project Manager.Supervisor.Leader
Desired Job Type: Full Time
Target Location:
Start Working: Negotiable
Overseas Work Experience: Yes
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
>>Working Experience
**Alcatel-Lucent
##Team Leader/Architecture 2006/8 - Now
Work Location:
Number of People under My Supervision: 15 People
Mainly jobs:
1:In charge of the maintains of Driver and BSP part for Evolium;
(Which based on the Mavell’s bridge and PPC750...)
2:In charge of the ATCA RNC ip part HLD, and part of works for the ATM
part, as well as the selection of hardware items;
3:In charge of the development and maintain for the Nortel Nodeb's BCS
(Almost equal to driver and eos), which based on vxworks and linux;
4:The BCS teams works in the
Global Product Support;
5:The taskforce schedule, Human resource inspirit, Progress schedule and
control, Quality progress define and control, as well as some other works;
6:The communication and cooperation and synchronization between team of
**ZTE Corporation
##Sr. engineer/Director of section office 2006/04 - 2006/08
Reporting to: Minister of Department
Number of People under My Supervision: 9 People
Responsibilities & Achievements:
Mainly Responsibilities:
Take the responsibility of the design and development of High Performance Router System. In charge of the
Human resources schedule and allocated.
Concretely Responsibilities:
Design of Operations, Design of the whole system, Resolve of difficulty, Daily works task force schedule;
Mainly jobs:
1:Design of the whole system(Include part of hardware/BSP/driver
/operation/part of protocol/part of data transmit)
2:Design of operation(include of most operation can support by the
router system)
3:Resolve of difficulty problems: difficult resolves involved hardware
and software as well as the outer-applied-problems
4:the distribute of the human resource base on previously works;
5:The topic of team member prompting/ Following up of the project progress / Risk prevent and avert..
##Sr. engineer/Leader of group2005/10 - 2006/04
Reporting to: PM
Number of People under My Supervision: 7 People
Responsibilities & Achievements:
Mainly Responsibilities:
In charge of the design and development of High Performance Router System
Concretely Responsibilities:
Design of Operations, Design of the whole system, Resolve of difficulty
problems ,distribute of Human resources
Mainly jobs:
1:Design of the whole system(Include part of hardware/BSP/driver
/operation/part of protocol/part of data transmit)
2:Design of operation(include of most operation can support by the
router system)
3:Resolve of difficulty problems: difficult resolves involved hardware
and software as well as the outer-applied-problems
4:the distribute of the human resource base on previously works
##Software&System Engineer |Nanjing R&D Institute2004/09 - 2005/10
Responsibilities & Achievements:
Maintenance bsp related and new functions design and coding
----------------------------------------------------------
Description of the Project:
Software Environment:win2000\uFF0CTORNADO2.11 TORNADO2.2
Hardware Environment:PC and ZTE PRODUCTED devices
Develop Tools: TORNADO2.11 TORNADO2.2 GNU MAK
Related Technologies(Just the main part)\uFF
1:Update the whole project from tornado 2.11 to 2.2
2:The new VPN related function’s design coding and test
3: Maintenance of BSP related
##Software&System Engineer |Nanjing R&D Institute2004/01 - 2004/09
Responsibilities & Achievements:
Development and maintenance of IPV6's driver and bsp
------------------------------------------------------------
Description of the Project:
Software Environment: win2000\uFF0CTORNADO2.11 TORNADO2.2
Hardware Environment: PC and ZTE PRODUCTED devices
Develop Tools: TORNADO2.11 TORNADO2.2 GNU MAK
Related Technologies(Just the main part)\uFF
1:RM related development and maintenance
2:BSP&BOOT's development and maintenance
3:Related interface board's development and maintenance
Reason for Quit: The seperation of protocol and driver
Company Profile:
Company Profile: ZTE Corporation is
equipment provider specializing in offering customized network solutions for
telecom carriers worldwide.
**NanJing YingYun Ltd.
SoftWare engineer |Development & Reaserch Department2002/07 - 2003/03
Responsibilities & Achievements:
The whole development process
Description of the Project;
Software Environment: window2000 ads
Hardware Environment:ibm workstation, telcommusic's voice cards
Develop Tools: vc++,sqlserver2000
Related Technologies(Just the main part;)
1,The voice ralated Embed programme.
2;Ralated functions of database operations
3;The realized of GUI of the Programme.
4.The Optimum of the database's performance
Reason for Quit: Write off of the company
Company Profile:
A corporation dedicated to the software on the filed of against orgery
products
**Civil
SoftWare Engineer |Education department2002/03 - 2002/06Location:
Responsibilities & Achievements: The whole development process
Description of the Project;
Software Environment: window2000,win98
Hardware Environment:common pc
Develop Tools: vc++,access
Related Technologies(Just the main part;)
1,Operation on database with
2;Realized the advanced GUI with VC
3:Dispoal and trasform of the pictures;
Reason for Quit: Complete of the Project
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
>>Education
**
Computer Application Related| Electronic Science and Technology| Master |Nanjing
**
Electronic and Mechanical Engineering| Machinery| Bachelor |ZiBo
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
>>Language
Chinese Mandarin: Mother tongue
English: Fluent
English: CET 6
Oral English: Fluent
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
>>Skills & Specialty
Conversance with development tool Tornado 2.11 &2.2;
Conversance with the BSP and BOOT development of 2400;
Conversance with the RESOUCE MANAGEMENT of NP'S;
Conversance with the architecture of 2350/2400/2800 cpu based on XSCALE;
Conversance with the Intel NP 2350/2400/2800;
Conversance with the Cavium Octeon NP/Wintegra Winpath NP
Conversance with asm language based on arm/xscale;
Conversance with v6 related and l2 relate operations (VPWS\VPLS\VSWITCH) as well as qos/frr/pbr/loadShare;
Familar with development of common device's driver;
Familar with the x86 ppc and mips based cpus;
Very familar with the product of Intel;
Visual C++ Conversance;
C/C++ Conversance;
Java Conversance;
Hardware Familar;
Windows NT/ 2000 Conversance;
Win32 Conversance;
XML Skillful;
AUTOCAD Skillful;
Linux Conversance;
OO Conversance;
HP-UX Skillful;
COM/DCOM Skillful;
Web Servers Skillful;
CORBA Skillful;
TCP/IP Familar;
ASP Familar;